{"id":20080,"date":"2025-02-19T18:33:07","date_gmt":"2025-02-19T14:33:07","guid":{"rendered":"https:\/\/aeeeurope.org\/?post_type=presentations&#038;p=20080"},"modified":"2025-02-19T18:33:08","modified_gmt":"2025-02-19T14:33:08","slug":"demonstration-of-embedded-commissioning-to-guarantee-operational-energy-performance","status":"publish","type":"presentations","link":"https:\/\/aeeeurope.org\/fr\/presentations\/demonstration-of-embedded-commissioning-to-guarantee-operational-energy-performance\/","title":{"rendered":"D\u00e9monstration de Commissioning int\u00e9gr\u00e9 pour garantir la performance \u00e9nerg\u00e9tique op\u00e9rationnelle"},"content":{"rendered":"","protected":false},"featured_media":0,"parent":0,"menu_order":0,"template":"","session":[98],"track":[104],"conference-day":[63],"chairperson":[61],"class_list":["post-20080","presentations","type-presentations","status-publish","hentry","session-session-b2","track-track-b","conference-day-day-2","chairperson-no"],"acf":[],"x_date":"f\u00e9vrier 19, 2025","x_metadata":{"_uabb_version":"1.36.1","time_slot":"09:00:00","_time_slot":"field_65bd2e8d55b4f","end_time":"09:30:00","_end_time":"field_65e9e9ebf4881","abstract":"<table class=\"x_MsoNormalTable\" border=\"0\" cellspacing=\"3\" cellpadding=\"0\">\r\n<tbody>\r\n<tr>\r\n<td>\r\n<p class=\"x_MsoNormal\">The Xpole building project, a 27,000 m\u00b2 tertiary office use, is the result of Schneider Electric's ambitious initiative to achieve the target of 20 kWh\/m\u00b2.an of final energy consumption for the building's scope of consumption excluding specific uses. This positive energy balance building consumes 36 kWh\/m\u00b2.an in final energy, all items fully compensated by a 900 kW photovoltaic power plant.<\/p>\r\n<p class=\"x_MsoNormal\">\r\nThe building is LEED Platinum certified, with an exceptional score of 96 points, mainly thanks to commissioning.\r\nThis specific commissioning approach was based on modelling and dynamic energy simulations to adapt the design in order to achieve the consumption target.\r\nRisk analysis then guided the implementation of preventive measures as part of the commissioning process, in areas such as the quality of the enclosure and the optimization and fine-tuning of technical equipment.<\/p>\r\n<p class=\"x_MsoNormal\">\r\nOnce the building had been handed over and was in operation, energy monitoring over 2 years was coupled with the recalibration of the dynamic energy model with the measurement data files for an objective assessment of the energy performance achieved.\r\nAs part of this, rigorous automated verification of the systems' operational compliance was introduced and continues to this day to assist the Facility Manager.<\/p>\r\n<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>","_abstract":"field_65bd2eb655b50","relationship_4":["20076","20325"],"_relationship_4":"field_65bd2ec355b51","relationship_3":["10078"],"_relationship_3":"field_65bd2f1055b52","cmplz_hide_cookiebanner":"","_seopress_redirections_type":"301","_seopress_redirections_logged_status":"both","_seopress_analysis_target_kw":"","_cmplz_scanned_post":"1"},"_links":{"self":[{"href":"https:\/\/aeeeurope.org\/fr\/wp-json\/wp\/v2\/presentations\/20080","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aeeeurope.org\/fr\/wp-json\/wp\/v2\/presentations"}],"about":[{"href":"https:\/\/aeeeurope.org\/fr\/wp-json\/wp\/v2\/types\/presentations"}],"wp:attachment":[{"href":"https:\/\/aeeeurope.org\/fr\/wp-json\/wp\/v2\/media?parent=20080"}],"wp:term":[{"taxonomy":"session","embeddable":true,"href":"https:\/\/aeeeurope.org\/fr\/wp-json\/wp\/v2\/session?post=20080"},{"taxonomy":"track","embeddable":true,"href":"https:\/\/aeeeurope.org\/fr\/wp-json\/wp\/v2\/track?post=20080"},{"taxonomy":"conference-day","embeddable":true,"href":"https:\/\/aeeeurope.org\/fr\/wp-json\/wp\/v2\/conference-day?post=20080"},{"taxonomy":"chairperson","embeddable":true,"href":"https:\/\/aeeeurope.org\/fr\/wp-json\/wp\/v2\/chairperson?post=20080"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}